Monday, 28 September 2009

WEEK 10 - Day 36 Walls of SH5 Removed to Warehouse Floor Level



With the roof trusses removed work on Stove House 5 continues to dismantle and remove the brick works. First this is being taken down to the warehouse floor level so that the floor boards can be removed.

A timelapse sequence was posted today of the removal of the asbestos roof sheets and timber boarding of Stove House 5.
Visit it at http://www.youtube.com/watch?v=UIMyJrvP4EM . A sequence showing the dismantling of the roof trusses will follow.

Tuesday, 11 August 2009

WEEK 3 - Day 10 - Stacking and Wrapping

Watched by a local, semi-resident we began wrapping an storing bricks and timber from the buildings being prepared for scaffolding support prior to dismantling. Pallets of materials are being labeled and protected from the elements by being shrink wrapped in plastic.