Wednesday, 23 September 2009

WEEK 9 - Day 34 Last Roof Truss of SH5 Dismantled


The last pieces of roof trusses were removed from Stove House 5 by lunch time today.
After a damp period yesterday our luck held and today was again dry and warm.
The large forklift took more pallets of timbers to the ground ready to be stored in our temporary building.

H&E scaffold team were hard at work along side Anelays removing unwanted sections of scaffold. The internal platforms are being removed and the upper sections of brickwork are to be taken down to the warehouse floor level. after which the floor boards themselves will be taken to the timber store.



A1 Environment Services came out into the daylight after long periods inside Warehouse 2 and 3 removing collapsed pieces of cement asbestos roofing sheets which have fallen onto the internal floors.

Monday, 7 September 2009

WEEK 7 - Day 24 Asbestos Removal Begins

A1 Environmental Ltd started removal of the roofing cement asbestos sheeting this morning. The first target was the Loading Bay.
Using a cherry picker the operatives spray the sheets to prevent dust and cut the securing fastenings in order to remove the sheets in one piece, avoiding breakages.
Tomorrow work moves to the main roof of Stove House 5.
http://www.a1environmental.co.uk/




Manouvering the cherry picker beneath the Loading Bay roof.













Wearing protective suits, gloves and masks the sheets are sprayed before cutting through the fastenings.